CRAIGGORE ENERGY LIMITED

UK Gazette Notices

6 April 2021
CRAIGGORE ENERGY LIMITED APPLICATION FOR A GENERATION LICENCE UNDER ARTICLE 10(1) (A) OF THE ELECTRICITY (NI) ORDER 1992 AS AMENDED BY THE ENERGY (NORTHERN IRELAND) ORDER 2003 1. Full name of the applicant(s) Craiggore Energy Limited 2. Address of the applicant(s), or in the case of a body corporate, the registered or principle office. 42-46 Fountain Street, Belfast, Antrim, BT1 5EF 3. Where the applicant is a company, the full names of the current Directors and the company’s registered number: Directors of Craiggore Energy Ltd are C Deperu, C N Williams and L K H Purves. Company Registration No: NI646810. 4. Where a holding of 20 per cent, or more of the shares (see Note) of an applicant is held by a body corporate or partnership or an incorporated association carrying on a trade or business with or without a view to profit, the name(s) and address(es) of the holder(s) of such shares shall be provided. Shares are 100% owned by ERG UK Holding Ltd, 2 Castle Terrace, 4th Floor, Edinburgh, United Kingdom, EH1 2EL. 5. Desired date from which the licence is to take effect: December 2021 6. The number of generating stations intended to be operated under the licence (if granted): 10 turbines 7. A sufficient description specifying the actual or proposed locations of those stations. E.g.: by reference to townlands, local government districts, postal address, etc. Craiggore Wind Farm in the townlands of Moneyguiggy and Craiggore Forest, Belraugh Road, Garvagh, County Londonderry. It is accessed off the Belraugh Road (B190). The grid reference for the substation of the wind farm is Easting 276584 Northing 417016. 8. A description of how those stations will, in each case, be fuelled or driven: The stations will be driven by wind. 9. The date when any proposed generating stations are expected to be commissioned: August 2021. 10. The capacity and type of each unit within the generating station (MW): Ten no. wind turbines each with a capacity of 2.35MW. The overall wind farm maximum export capacity (MEC) will be 23.5MW. 11. A statement of the extent (if any) to which the applicant considers it necessary for powers under Schedule 3 (compulsory acquisition of land etc.) and under Schedule 4 (other powers etc.) to the Order to be given through the licence for which he is applying, together with a statement of any specific purposes for which those powers are felt to be necessary. None 12. Details of any licences held, applied for or being applied for by the applicant in respect of the generation, participation in transmission or supply of electricity: None

14 June 2021
CRAIGGORE ENERGY LIMITED APPLICATION FOR A GENERATION LICENCE UNDER ARTICLE 10(1) (A) OF THE ELECTRICITY (NI) ORDER 1992 AS AMENDED BY THE ENERGY (NORTHERN IRELAND) ORDER 2003 1. Full name of the applicant(s) Craiggore Energy Limited 2. Address of the applicant(s), or in the case of a body corporate, the registered or principle office. 42-46 Fountain Street, Belfast, Antrim, BT1 5EF 3. Where the applicant is a company, the full names of the current Directors and the company’s registered number: Directors of Craiggore Energy Ltd are C Deperu, C N Williams and L K H Purves. Company Registration No: NI646810. 4. Where a holding of 20 per cent, or more of the shares (see Note) of an applicant is held by a body corporate or partnership or an incorporated association carrying on a trade or business with or without a view to profit, the name(s) and address(es) of the holder(s) of such shares shall be provided. Shares are 100% owned by ERG UK Holding Ltd, 2 Castle Terrace, 4th Floor, Edinburgh, United Kingdom, EH1 2EL. 5. Desired date from which the licence is to take effect: December 2021 6. The number of generating stations intended to be operated under the licence (if granted): 10 turbines 7. A sufficient description specifying the actual or proposed locations of those stations. E.g.: by reference to townlands, local government districts, postal address, etc. Craiggore Wind Farm in the townlands of Moneyguiggy and Craiggore Forest, Belraugh Road, Garvagh, County Londonderry. It is accessed off the Belraugh Road (B190). The grid reference for the substation of the wind farm is Easting 276584 Northing 417016. 8. A description of how those stations will, in each case, be fuelled or driven: The stations will be driven by wind. 9. The date when any proposed generating stations are expected to be commissioned: August 2021. 10. The capacity and type of each unit within the generating station (MW): Ten no. wind turbines each with a capacity of 2.35MW. The overall wind farm maximum export capacity (MEC) will be 23.5MW. 11. A statement of the extent (if any) to which the applicant considers it necessary for powers under Schedule 3 (compulsory acquisition of land etc.) and under Schedule 4 (other powers etc.) to the Order to be given through the licence for which he is applying, together with a statement of any specific purposes for which those powers are felt to be necessary. None 12. Details of any licences held, applied for or being applied for by the applicant in respect of the generation, participation in transmission or supply of electricity: None


More Company Information


Follow Company
  • Receive an alert email on changes to financial status
  • Early indications of liquidity problems
  • Warns when company reporting is overdue
  • Free service, no spam emails
  • Follow this company