CRAIGGORE ENERGY LIMITED
UK Gazette Notices
6 April 2021
CRAIGGORE ENERGY LIMITED
APPLICATION FOR A GENERATION LICENCE UNDER ARTICLE
10(1) (A) OF THE ELECTRICITY (NI) ORDER 1992 AS AMENDED
BY THE ENERGY (NORTHERN IRELAND) ORDER 2003
1. Full name of the applicant(s)
Craiggore Energy Limited
2. Address of the applicant(s), or in the case of a body corporate, the
registered or principle office.
42-46 Fountain Street, Belfast, Antrim, BT1 5EF
3. Where the applicant is a company, the full names of the current
Directors and the company’s registered number:
Directors of Craiggore Energy Ltd are C Deperu, C N Williams and
L K H Purves. Company Registration No: NI646810.
4. Where a holding of 20 per cent, or more of the shares (see Note) of
an applicant is held by a body corporate or partnership or an
incorporated association carrying on a trade or business with or
without a view to profit, the name(s) and address(es) of the holder(s)
of such shares shall be provided.
Shares are 100% owned by ERG UK Holding Ltd, 2 Castle
Terrace, 4th Floor, Edinburgh, United Kingdom, EH1 2EL.
5. Desired date from which the licence is to take effect:
December 2021
6. The number of generating stations intended to be operated under
the licence (if granted):
10 turbines
7. A sufficient description specifying the actual or proposed locations
of those stations. E.g.: by reference to townlands, local government
districts, postal address, etc.
Craiggore Wind Farm in the townlands of Moneyguiggy and
Craiggore Forest, Belraugh Road, Garvagh, County Londonderry.
It is accessed off the Belraugh Road (B190). The grid reference
for the substation of the wind farm is Easting 276584 Northing
417016.
8. A description of how those stations will, in each case, be fuelled or
driven:
The stations will be driven by wind.
9. The date when any proposed generating stations are expected to
be commissioned:
August 2021.
10. The capacity and type of each unit within the generating station
(MW):
Ten no. wind turbines each with a capacity of 2.35MW. The overall
wind farm maximum export capacity (MEC) will be 23.5MW.
11. A statement of the extent (if any) to which the applicant considers
it necessary for powers under Schedule 3 (compulsory acquisition of
land etc.) and under Schedule 4 (other powers etc.) to the Order to be
given through the licence for which he is applying, together with a
statement of any specific purposes for which those powers are felt to
be necessary.
None
12. Details of any licences held, applied for or being applied for by the
applicant in respect of the generation, participation in transmission or
supply of electricity:
None
14 June 2021
CRAIGGORE ENERGY LIMITED
APPLICATION FOR A GENERATION LICENCE UNDER ARTICLE
10(1) (A) OF THE ELECTRICITY (NI) ORDER 1992 AS AMENDED
BY THE ENERGY (NORTHERN IRELAND) ORDER 2003
1. Full name of the applicant(s)
Craiggore Energy Limited
2. Address of the applicant(s), or in the case of a body corporate, the
registered or principle office.
42-46 Fountain Street, Belfast, Antrim, BT1 5EF
3. Where the applicant is a company, the full names of the current
Directors and the company’s registered number:
Directors of Craiggore Energy Ltd are C Deperu, C N Williams and
L K H Purves. Company Registration No: NI646810.
4. Where a holding of 20 per cent, or more of the shares (see Note) of
an applicant is held by a body corporate or partnership or an
incorporated association carrying on a trade or business with or
without a view to profit, the name(s) and address(es) of the holder(s)
of such shares shall be provided.
Shares are 100% owned by ERG UK Holding Ltd, 2 Castle
Terrace, 4th Floor, Edinburgh, United Kingdom, EH1 2EL.
5. Desired date from which the licence is to take effect:
December 2021
6. The number of generating stations intended to be operated under
the licence (if granted):
10 turbines
7. A sufficient description specifying the actual or proposed locations
of those stations. E.g.: by reference to townlands, local government
districts, postal address, etc.
Craiggore Wind Farm in the townlands of Moneyguiggy and
Craiggore Forest, Belraugh Road, Garvagh, County Londonderry.
It is accessed off the Belraugh Road (B190). The grid reference
for the substation of the wind farm is Easting 276584 Northing
417016.
8. A description of how those stations will, in each case, be fuelled or
driven:
The stations will be driven by wind.
9. The date when any proposed generating stations are expected to
be commissioned:
August 2021.
10. The capacity and type of each unit within the generating station
(MW):
Ten no. wind turbines each with a capacity of 2.35MW. The overall
wind farm maximum export capacity (MEC) will be 23.5MW.
11. A statement of the extent (if any) to which the applicant considers
it necessary for powers under Schedule 3 (compulsory acquisition of
land etc.) and under Schedule 4 (other powers etc.) to the Order to be
given through the licence for which he is applying, together with a
statement of any specific purposes for which those powers are felt to
be necessary.
None
12. Details of any licences held, applied for or being applied for by the
applicant in respect of the generation, participation in transmission or
supply of electricity:
None
More Company Information
Recently Viewed
Follow Company
- Receive an alert email on changes to financial status
- Early indications of liquidity problems
- Warns when company reporting is overdue
- Free service, no spam emails Follow this company