26 May 2015
LIGHTSOURCE SPV 10 LIMITED
APPLICATION FOR A GENERATION LICENCE UNDER ARTICLE
10(1)(A) OF THE ELECTRICITY (NI) ORDER 1992
AS AMENDED BY THE ENERGY (NORTHERN IRELAND) ORDER
Full name of the applicant: Lightsource SPV 10 Limited
Address of the applicant(s) or, in the case of a body corporate, the
registered or principal office: 7TH FLOOR, 33 HOLBORN, LONDON,
ENGLAND, EC1N 2HT
Where the applicant is a company, the full names of the current
Directors and the company’s registered number.
Mark Turner & Kareen Boutonnat
Company Registration No: 07738988
Where a holding of 20 per cent, or more of the shares (see Note) of an
applicant is held by a body corporate or partnership or an
incorporated association carrying on a trade or business with or
without a view to profit, the name(s) and address (es) of the holder(s)
of such shares shall be provided.
Lightsource Renewable Energy Limited, 7TH FLOOR, 33
HOLBORN, LONDON, EC1N 2HT
Desired date from which the licence is to take effect. As soon as
possible
The number of generating stations intended to be operated under the
licence (if granted).
1 PV Solar Park, with a combined total of 3 Photovoltaic Inverters
(Power Electronics, 2 x 1190 kW, 1x 1360 kW) (Provisional Design
Only)
A sufficient description specifying the actual or proposed locations of
those stations. E.g.: by reference to townlands, local government
districts, postal address, etc.
Crookedstone Road, Aldergrove, County Antrim
A description of how those stations will, in each case, be fuelled or
driven. Solar Photovoltaic Modules and Inverters
The date when any proposed generating stations are expected to be
commissioned. October 2015
The capacity and type of each unit within the generating station (MW).
Crookedstone Road: 3.39 MVA
1 PV Solar Park, with a combined total of 3 Photovoltaic Inverters
(Power Electronics, 2 x 1190 kW, 1x 1360 kW) (Provisional Design
Only)
Details of any licences held, applied for or being applied for by the
applicant in respect of the generation, participation in transmission or
supply of electricity. None
HUNTERS HILL WIND FARM LTD (EGLISH SITE)
APPLICATION FOR A GENERATION LICENCE UNDER ARTICLE
10(1)(A) OF THE ELECTRICITY (NI) ORDER 1992
AS AMENDED BY THE ENERGY (NORTHERN IRELAND) ORDER
1. Full name of the applicant:
Hunters Hill Wind Farm Ltd Eglish Site
2. Address of the applicant(s) or, in the case of a body corporate, the
registered or principal office.
Hunters Hill Wind Farm Ltd. Eglish Site
2 Electra Road
Maydown
Londonderry
BT47 6UL
3. Where the applicant is a company, the full names of the current
Directors and the company’s registered number.
The company directors are :Francis O’Donnell, Garry Kavanagh and
Joe Scally
Company Registration No. NI067362
4. Where a holding of 20 per cent, or more of the shares (see Note) of
an applicant is held by a body corporate or partnership or an
incorporated association carrying on a trade or business with or
without a view to profit, the name(s) and address(es) of the holder(s)
of such shares shall be provided.
Not applicable
5. Desired date from which the licence is to take effect.
Estimated 3rd quarter 2016
6. The number of generating stations intended to be operated under
the licence (if granted).
6 off 3MW
7. A sufficient description specifying the actual or proposed locations
of those stations. Eg: by reference to townlands, local government
districts, postal address, etc.
The site is located on the northern slopes of Eglish Hill at a distance
of approx. 6km east of Donemana co. Tyrone and approx. 5km south-
west of Claudy Co. Derry.
The Derry – Tyrone county boundary runs through the site and the
relevant Local Government Districts are Derry and Strabane.
The majority of the development will take place in the portion of the
site lying in Co. Derry.
The site appears on Ordinance Survey of Northern Ireland Discovery
Series (1:50,000) map Sheet 7.
The proposed development site lies in the townland of Ballyartan.
Grid reference for the site (12 digit) is 065808567600
8. A description of how those stations will, in each case, be fuelled or
driven. The proposed development is a wind farm comprising 6 wind
turbines, each with tip height up to 107m.
9. The date when any proposed generating stations are expected to
be commissioned.
Estimated 3rd quarter 2016
10. The capacity and type of each unit within the generating station
(MW).
The maximum output from each of the 6 turbine will be up to 3 MW,
giving a total generating capacity of up to 18 MW. The turbines will be
3MW
11. A statement of the extent (if any) to which the applicant considers
it necessary for powers under Schedule 3 (compulsory acquisition of
land etc.) and under Schedule 4 (other powers etc) to the Order to be
given through the licence for which he is applying, together with a
statement of any specific purposes for which those powers are felt to
be necessary.
None
12. Details of any licences held, applied for or being applied for by the
applicant in respect of the generation, transmission or supply of
electricity
See response 12.A
Name(s) of person or persons to contact regarding information
contained in or accompanying this application.
See response 12.B
12A
ESB Wind Development have current Generation Licences for Hunters
Hill Wind Farm, Crockagarran Wind Farm, Curryfree Wind Farm,
Carrickatane Wind Farm
ESB International have constructed the CCGT plant at Coolkeeragh
and currently operate the facility under an O&M contract.
ESB Independent Energy (NI) Ltd, is a wholly-owned subsidiary of
ESB International, and currently holds a second tier supply licence in
Northern Ireland for supply of electricity to the industrial and
commercial market.
Full Planning Permission granted 29th July 2013 Ref. A/2005/0223/F
Grid Connection Application Offer received 12th March 2014 and
accepted
Article 39 Construction of Generating Station has been applied for.
12B
ENVIRONMENTAL PROTECTION
ENVIRONMENT & INFRASTRUCTURE
Declan O’Connor
ESB Asset Development,
27 Lower Fitzwilliam St.
Dublin 4
Mobile number00353 876623842
Email [email protected]
Copies of the maps relevant to this application have been lodged in
accordance with Schedule 2 of Part II of the Electricity (Applications
for Licences and Extensions of Licences) Regulations (Northern
Ireland) 1992 at the Office for the Regulation of Electricity and Gas,
Queens House, 14 Queen Street, BELFAST BT1 6ER. Copies are
available for inspection by the public between 10 a.m. and 4 p.m. on
any working day.
More Company Information
- Company overview
- All company documents and filing history
- People connected with this company
- Financial details of LYCEUM SPV 10 LIMITED
- Who controls this company?
- Charges and Mortgages registered against company
- Notices placed in The UK Official Public Gazette
- Location, contact details and map
- Related companies and people
Follow Company
- Receive an alert email on changes to financial status
- Early indications of liquidity problems
- Warns when company reporting is overdue
- Free service, no spam emails Follow this company